The typical timeline

Standard single-family home with architectural shingles: 1–2 days of on-roof work. Larger or complex roofs (steep pitch, multiple valleys, dormers): 2–4 days. Tile and metal: 3–7 days depending on system and complexity.

That’s active construction days. Total project time from signed contract to completion is typically 1–3 weeks, with most of that being material ordering and crew scheduling — your home isn’t a job site during the wait.

Day-by-day: what actually happens

Day 1: tear-off (loud, fast — usually done by midday), decking inspection and repair, underlayment and ice-and-water shield, often starter courses and first shingle sections. Your home is weatherproofed every night — we never leave a roof exposed.

Final day: field shingles or panels completed, ridge/flashing details, full cleanup with magnetic nail sweep, final walkthrough with you and photos of the finished system.

What stretches the schedule

Weather: we don’t tear off in active rain or dangerous wind — a lost day to weather is a roof done right versus a roof done wet. Decking surprises: extensive rot adds repair time, priced transparently per sheet.

Material backorders on specialty products, and scope additions you request mid-project (skylight replacement is the classic — smart to do, adds a day). What shouldn’t stretch it: crew no-shows and disorganization. Ask your contractor how they handle weather days before you sign.

Living through it

You can absolutely live in the house — it’s loud during tear-off and nailing hours, and keep pets secured away from the work zone. Park cars away from the house; we protect landscaping but gravity is undefeated.